PT Request a proposal

Two storeys · 50 m² terrace

CEDRO 114

Contemporary architecture with a flat roof. On the ground floor, living room with kitchen and utility room; upstairs, three bedrooms, two walk-in wardrobes and a 50 m² roof terrace.

Layout
T3
Living area
114.4 m²
Building area
201 m²
Floors
2 floors
Bathrooms
2
Production
~3 months

Factory kit

€ 55,200 + VAT

Kit without assembly: delivered to site for you to build. Transport is quoted per project and fixed in the contract.

Finished house

€ 138,000 – € 184,000

Indicative estimate: the factory kit is roughly 30–40% of the cost of the finished house. The final price depends on the materials chosen and is fixed in the written proposal.

Request a proposal for CEDRO 114

Ideal for: A contemporary family home with a large upper-floor terrace.

Floor plan

Floor plan and areas

Ground floor

0.1Entrance6 m²
1.1Hall with stairs and wardrobe9.8 m²
1.2Living room with kitchen and dining33.7 m²
1.3Shower room and WC3.6 m²
1.4Utility room9 m²
1.5Terrace18 m²

First floor

2.1Hall4.9 m²
2.2Bedroom8.9 m²
2.3Bedroom11.4 m²
2.4Walk-in wardrobe3 m²
2.5Shower room and WC7.1 m²
2.6Bedroom15.6 m²
2.7Walk-in wardrobe5.6 m²
2.8Balcony / terrace50 m²

Indicative areas of the standard design. The plan can be adjusted; final areas are set in the permit drawings.

The kit price includes

  • Wall panels made and closed in the factory
  • Standard wall: C24 timber frame and 275 mm insulation
  • Roof structure: CE-marked trusses
  • Assembly documentation for the system

The kit does not include windows and doors, roof covering (tiles or metal), finishes, transport or assembly. All of these are quoted separately for each project.

The wall build-up (frame and insulation thickness) depends on the exterior finish — render on wood-fibre board or ventilated cladding — and on the climate zone of the plot. We engineer each wall for your project; the published price refers to the standard wall.

Quoted separately, per project

  • Transport from the factory
  • Assembly on site (structure in 2–5 days)
  • Foundations and utility connections (water, electricity, drainage)
  • Interior finishes
  • Land, permits and VAT

Request a proposal

CEDRO 114 on your plot

Tell us the municipality and we reply with a proposal: kit, transport and assembly for your case.