Wall panels
Panels closed in the factory: C24 frame, insulation and membranes.
275 mm insulation · U 0.14 W/m²K
Structures
For builders, architects and developers who want materials for their own projects. Buy materials only, with optional assembly. You keep the relationship with the end client. Delivery to site, with transport quoted separately.
Request a materials quote
Products
Panels closed in the factory: C24 frame, insulation and membranes.
275 mm insulation · U 0.14 W/m²K
Roof panels with 300 mm of insulation, for a continuous envelope.
300 mm insulation · U 0.13 W/m²K
CE-marked trusses, designed in MiTek for your project.
Spans up to 12 m · CE LVS EN 14250
C24 timber cut to measure for your project.
C24 · cut per project
Supplied through partners and fitted on site once the structure is up. They travel packed separately from the panels, so they arrive undamaged.
Fitted on site
Fibre-cement boards for façades and cladding, durable and resistant to fire and moisture.
Data sheets and price on request
Exclusive naturheld distributor in Portugal: boards, FLEX and FLOW.
naturheld →
Specifications
275 mm insulation
300 mm insulation
structural grade
CE marking, LVS EN 14250
factory quality management
U-values: Ubakus reports, 08/2026. Roof trusses can reduce timber use by up to 30% and foundation costs by up to 30%, depending on the design.
Materials leave the factory in Birzgale, Latvia. Panel production: about 2 weeks for a 150 m² reference; typical factory lead time: about 3 months. Transport is quoted per project, by volume and destination.
Assembly is optional: by our team, which erects the structure in 2–5 days, or by your builder, with technical support.
Quote
For a materials quote, list the products, quantities or approximate area, and project municipality. A floor plan helps.